Show Navigation

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
{ 123 images found }

Loading ()...

  • The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    MK-20220131-HS2-works-West-Hyde-006.jpg
  • The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    MK-20220131-HS2-works-West-Hyde-001.jpg
  • Construction work close to the South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    MK-20220131-HS2-works-West-Hyde-022.jpg
  • The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    MK-20220131-HS2-works-West-Hyde-004.jpg
  • A viaduct precast factory at the South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    MK-20220131-HS2-works-West-Hyde-033.jpg
  • Construction works for a vent shaft from the Chiltern tunnel section of the HS2 high-speed rail link are pictured on 7th February 2022 in Amersham, United Kingdom. The Amersham vent shaft will be one of four vent shafts used to regulate air quality and temperature in the 16km Chiltern tunnel.
    MK-20220207-HS2-Amersham-vent-shaft-...jpg
  • Preparatory works for the Chiltern Tunnel section of the HS2 high-speed rail link are pictured on 16th February 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    MK-20220216-HS2-works-Colne-Valley-0...jpg
  • Construction works for a vent shaft from the Chiltern tunnel section of the HS2 high-speed rail link are pictured on 7th February 2022 in Amersham, United Kingdom. The Amersham vent shaft will be one of four vent shafts used to regulate air quality and temperature in the 16km Chiltern tunnel.
    MK-20220207-HS2-Amersham-vent-shaft-...jpg
  • Construction works for a vent shaft from the Chiltern tunnel section of the HS2 high-speed rail link are pictured on 7th February 2022 in Amersham, United Kingdom. The Amersham vent shaft will be one of four vent shafts used to regulate air quality and temperature in the 16km Chiltern tunnel.
    MK-20220207-HS2-Amersham-vent-shaft-...jpg
  • An anti-HS2 activist releases himself from a tripod used to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Hertfordshire Police officers arrest an anti-HS2 activist who blocked one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • An anti-HS2 activist uses a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Hertfordshire Police officers arrest an anti-HS2 activist who blocked one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Hertfordshire Police officers arrest anti-HS2 activists who blocked an entrance to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Hertfordshire Police officers arrest an anti-HS2 activist who used a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Hertfordshire Police officers invoke Section 14 of the Public Order Act 1986 to clear a press photographer from an area outside an entrance to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action by anti-HS2 activists, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • A senior Hertfordshire Police officer invokes Section 14 of the Public Order Act 1986 to clear anti-HS2 activists and press photographers from an area outside an entrance to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action by anti-HS2 activists, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use arm tube lock-ons and a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use an arm tube lock-on and a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • An anti-HS2 activist uses a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a lock-on arm tube to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Hertfordshire Police officers arrest an anti-HS2 activist who used a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Hertfordshire Police officers arrest an anti-HS2 activist who used a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • An anti-HS2 activist uses a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • An anti-HS2 activist with a smoke grenade uses a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • An anti-HS2 activist protests with a sign outside one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use an arm-tube lock-on and a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use arm tube lock-ons and a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Trucks queue as anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • An anti-HS2 activist uses a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • An anti-HS2 activist uses a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use tripods to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Hertfordshire Police officers arrest an anti-HS2 activist after invoking Section 14 of the Public Order Act 1986 to clear an area outside an entrance to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. A protest action by anti-HS2 activists, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use tripods to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • The recently-completed 17m South Portal headwall for the 10-mile Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 8 September 2020 in West Hyde, United Kingdom. Construction of the headwall and ground reinforcement using more than 636 soil nails were the final stages requiring completion prior to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines / TBMs.
    MK-20200908-HS2-Rebellion-Denham-cam...jpg
  • Preparatory works for the HS2 high-speed rail link at the South Portal site are pictured on 14 September 2020 in West Hyde, United Kingdom. A 17m headwall for the 10-mile Chiltern Tunnel was recently completed at the site as a prelude to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines (TBMs).
    MK-20200914-HS2-West-Hyde-South-Port...jpg
  • Preparatory works for the HS2 high-speed rail link at the South Portal site are pictured on 14 September 2020 in West Hyde, United Kingdom. A 17m headwall for the 10-mile Chiltern Tunnel was recently completed at the site as a prelude to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines (TBMs).
    MK-20200914-HS2-West-Hyde-South-Port...jpg
  • Preparatory works for the HS2 high-speed rail link at the South Portal site are pictured on 14 September 2020 in West Hyde, United Kingdom. A 17m headwall for the 10-mile Chiltern Tunnel was recently completed at the site as a prelude to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines (TBMs).
    MK-20200914-HS2-West-Hyde-South-Port...jpg
  • Preparatory works for the HS2 high-speed rail link at the South Portal site are pictured on 14 September 2020 in West Hyde, United Kingdom. A 17m headwall for the 10-mile Chiltern Tunnel was recently completed at the site as a prelude to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines (TBMs).
    MK-20200914-HS2-West-Hyde-South-Port...jpg
  • Cattle graze in fields in front of works for a ventilation shaft for the Chiltern tunnel section of the HS2 high-speed rail link on 25th June 2021 in Chalfont St Giles, United Kingdom. Contractors working for HS2 Ltd have constructed a temporary haul road and embankment alongside Bottom House Farm Lane in order to access the site.
    MK-20210625-HS2-works-Bottom-House-F...jpg
  • Cattle graze in a field in front of works for a ventilation shaft for the Chiltern tunnel section of the HS2 high-speed rail link on 25th June 2021 in Chalfont St Giles, United Kingdom. Contractors working for HS2 Ltd have constructed a temporary haul road and embankment alongside Bottom House Farm Lane in order to access the site.
    MK-20210625-HS2-works-Bottom-House-F...jpg
  • A High Court injunction notice is displayed on fencing at the site of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors MWCC working on the £106bn rail project in April 2020.
    MK-20200718-HS2-works-Chalfont-St-Gi...jpg
  • Earth is piled up at the site of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors MWCC working on the £106bn rail project in April 2020.
    MK-20200718-HS2-works-Chalfont-St-Gi...jpg
  • Earth is piled up at the site of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors MWCC working on the £106bn rail project in April 2020.
    MK-20200718-HS2-works-Chalfont-St-Gi...jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors MWCC working on the £106bn rail project in April 2020.
    MK-20200718-HS2-works-Chalfont-St-Gi...jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors MWCC working on the £106bn rail project in April 2020.
    MK-20200718-HS2-works-Chalfont-St-Gi...jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors MWCC working on the £106bn rail project in April 2020.
    MK-20200718-HS2-works-Chalfont-St-Gi...jpg
  • HS2 contractors work at the site of a ventilation shaft for the Chiltern Tunnel section of the HS2 high-speed rail link on 25th November 2020 in Chalfont St Giles, United Kingdom. The works, off Bottom House Farm Lane, include the construction of a temporary haul road and an embankment as well as the ventilation shaft.
    MK-20201125-HS2-Chalfont-St-Giles-wo...jpg
  • A sign indicates the site of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Peter, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors MWCC working on the £106bn rail project in April 2020.
    MK-20200718-HS2-works-Chalfont-St-Pe...jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors MWCC working on the £106bn rail project in April 2020.
    MK-20200718-HS2-works-Chalfont-St-Gi...jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors MWCC working on the £106bn rail project in April 2020.
    MK-20200718-HS2-works-Chalfont-St-Gi...jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors MWCC working on the £106bn rail project in April 2020.
    MK-20200718-HS2-works-Chalfont-St-Gi...jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors MWCC working on the £106bn rail project in April 2020.
    MK-20200718-HS2-works-Chalfont-St-Gi...jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors MWCC working on the £106bn rail project in April 2020.
    MK-20200718-HS2-works-Chalfont-St-Gi...jpg
  • HS2 contractors work at the site of a temporary haul road to be used to transport heavy vehicles during the construction of a ventilation shaft for the Chiltern Tunnel section of the HS2 high-speed rail link on 25th November 2020 in Chalfont St Giles, United Kingdom. The works, off Bottom House Farm Lane, include the construction of an embankment as well as the temporary haul road and ventilation shaft.
    MK-20201125-HS2-Chalfont-St-Giles-wo...jpg
  • Earth is piled up at the site of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors MWCC working on the £106bn rail project in April 2020.
    MK-20200718-HS2-works-Chalfont-St-Gi...jpg
  • A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors MWCC working on the £106bn rail project in April 2020.
    MK-20200718-HS2-works-Chalfont-St-Gi...jpg
  • A compound being used for works to construct a ventilation shaft for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 30th March 2021 in Chalfont St Giles, United Kingdom. The works alongside Bottom House Farm Lane also include the construction of a temporary haul road and an embankment.
    MK-20210330-HS2-Chalfont-St-Giles-Bo...jpg
  • A new Affinity Water pipeline is constructed between Chalfont St Giles and Amersham in conjunction with the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The pipeline is being constructed to protect against the creation of turbidity, or cloudy water, in the water supply due to tunnelling and piledriving activities on the HS2 project.
    MK-20200718-HS2-works-Chalfont-St-Gi...jpg
  • A new Affinity Water pipeline is constructed between Chalfont St Giles and Amersham in conjunction with the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The pipeline is being constructed to protect against the creation of turbidity, or cloudy water, in the water supply due to tunnelling and piledriving activities on the HS2 project.
    MK-20200718-HS2-works-Chalfont-St-Gi...jpg
  • A Hertfordshire Police cutting team prepares to remove two environmental activists from HS2 Rebellion who used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A Hertfordshire Police cutting team works to remove two environmental activists from HS2 Rebellion who used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A Hertfordshire Police Incident Commander oversees a policing operation to remove HS2 Rebellion activists who had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A Hertfordshire Police cutting team works to remove two environmental activists from HS2 Rebellion who used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A Hertfordshire Police cutting team works to remove two environmental activists from HS2 Rebellion who used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A Hertfordshire Police cutting team works to remove two environmental activists from HS2 Rebellion who used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A Hertfordshire Police cutting team works to remove two environmental activists from HS2 Rebellion who used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use lock-on arm tubes to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A Hertfordshire Police cutting team works to remove two environmental activists from HS2 Rebellion who used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use lock-on arm tubes to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
Next
  • Facebook
  • Twitter
x

In Pictures

  • About
  • Contact
  • Join In Pictures
  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area