Show Navigation

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
{ 666 images found }

Loading ()...

  • Construction work close to the South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    MK-20220131-HS2-works-West-Hyde-022.jpg
  • Precision-engineered tunnel segments are pictured at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    MK-20220131-HS2-works-West-Hyde-009.jpg
  • Precision-engineered tunnel segments are pictured at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    MK-20220131-HS2-works-West-Hyde-005.jpg
  • The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    MK-20220131-HS2-works-West-Hyde-006.jpg
  • The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    MK-20220131-HS2-works-West-Hyde-004.jpg
  • The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    MK-20220131-HS2-works-West-Hyde-001.jpg
  • A viaduct precast factory at the South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    MK-20220131-HS2-works-West-Hyde-033.jpg
  • Saplings planted by HS2 Ltd as part of measures to mitigate environmental damage from the HS2 high-speed rail link are pictured on 14 September 2020 in West Hyde, United Kingdom. The mitigation scheme included the creation in early 2018 of an ‘ecology habitat’ containing 40,000 such saplings but many appear to have since died.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A Hertfordshire Police cutting team prepares to remove two environmental activists from HS2 Rebellion who used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A Hertfordshire Police cutting team works to remove two environmental activists from HS2 Rebellion who used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A Hertfordshire Police cutting team works to remove two environmental activists from HS2 Rebellion who used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A Hertfordshire Police cutting team works to remove two environmental activists from HS2 Rebellion who used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A Hertfordshire Police cutting team works to remove two environmental activists from HS2 Rebellion who used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A Hertfordshire Police cutting team works to remove two environmental activists from HS2 Rebellion who used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion stand holding a Stop HS2 banner close to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the site for the £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A Hertfordshire Police Incident Commander oversees a policing operation to remove HS2 Rebellion activists who had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A Hertfordshire Police cutting team works to remove two environmental activists from HS2 Rebellion who used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail link, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A banner regarding bat roosts is displayed on a fence by environmental activists from HS2 Rebellion who blocked two gates to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use lock-on arm tubes to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • A coronavirus warning notice at the entrance to the South Portal site for the HS2 high-speed rail link is pictured on 14 September 2020 in West Hyde, United Kingdom.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police attend a protest by environmental activists from HS2 Rebellion who used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists simultaneously blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Preparatory works for the HS2 high-speed rail link at the South Portal site are pictured on 14 September 2020 in West Hyde, United Kingdom. A 17m headwall for the 10-mile Chiltern Tunnel was recently completed at the site as a prelude to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines (TBMs).
    MK-20200914-HS2-West-Hyde-South-Port...jpg
  • Preparatory works for the HS2 high-speed rail link at the South Portal site are pictured on 14 September 2020 in West Hyde, United Kingdom. A 17m headwall for the 10-mile Chiltern Tunnel was recently completed at the site as a prelude to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines (TBMs).
    MK-20200914-HS2-West-Hyde-South-Port...jpg
  • Preparatory works for the HS2 high-speed rail link at the South Portal site are pictured on 14 September 2020 in West Hyde, United Kingdom. A 17m headwall for the 10-mile Chiltern Tunnel was recently completed at the site as a prelude to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines (TBMs).
    MK-20200914-HS2-West-Hyde-South-Port...jpg
  • Preparatory works for the HS2 high-speed rail link at the South Portal site are pictured on 14 September 2020 in West Hyde, United Kingdom. A 17m headwall for the 10-mile Chiltern Tunnel was recently completed at the site as a prelude to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines (TBMs).
    MK-20200914-HS2-West-Hyde-South-Port...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use lock-on arm tubes to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Hertfordshire Police arrest an environmental activist from HS2 Rebellion who, together with another activist, had used a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Environmental activists from HS2 Rebellion use a lock-on arm tube to block a gate to the South Portal site for the HS2 high-speed rail link on 14 September 2020 in West Hyde, United Kingdom. Anti-HS2 activists blocked two gates to the same works site for the controversial £106bn rail line, one remaining closed for over six hours and another for over twelve hours.
    MK-20200914-HS2-West-Hyde-tunnel-blo...jpg
  • Preparatory works for the Chiltern Tunnel section of the HS2 high-speed rail link are pictured on 16th February 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    MK-20220216-HS2-works-Colne-Valley-0...jpg
  • Anti-HS2 activists use arm tube lock-ons and a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • An excavator moves the remnants of felled trees in front of precision-engineered tunnel segments at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 9th July 2021 in West Hyde, United Kingdom. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine TBM, named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    MK-20210709-HS2-works-South-Portal-C...jpg
  • An excavator moves the remnants of felled trees in front of precision-engineered tunnel segments at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 9th July 2021 in West Hyde, United Kingdom. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine TBM, named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    MK-20210709-HS2-works-South-Portal-C...jpg
  • An excavator moves the remnants of felled trees in front of precision-engineered tunnel segments at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 9th July 2021 in West Hyde, United Kingdom. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine TBM, named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    MK-20210709-HS2-works-South-Portal-C...jpg
  • Precision-engineered, fibre-reinforced tunnel segments are pictured at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 9th July 2021 in West Hyde, United Kingdom. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine TBM, named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    MK-20210709-HS2-works-South-Portal-C...jpg
  • The South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link is pictured on 9th July 2021 in West Hyde, United Kingdom. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine TBM, named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    MK-20210709-HS2-works-South-Portal-C...jpg
  • Precision-engineered, fibre-reinforced tunnel segments are pictured at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 13th May 2021 in West Hyde, United Kingdom. HS2 consortium Align today launched its first 2,000-tonne tunnel boring machine TBM, named Florence after Florence Nightingale, to begin drilling one of a pair of 10-mile tunnels under the Chilterns.
    MK-20210513-HS2-Chiltern-tunnel-bori...jpg
  • The South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link is pictured on 13th May 2021 in West Hyde, United Kingdom. HS2 consortium Align today launched its first 2,000-tonne tunnel boring machine TBM, named Florence after Florence Nightingale, to begin drilling one of a pair of 10-mile tunnels under the Chilterns.
    MK-20210513-HS2-Chiltern-tunnel-bori...jpg
  • An anti-HS2 activist releases himself from a tripod used to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Hertfordshire Police officers arrest an anti-HS2 activist who used a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Hertfordshire Police officers arrest an anti-HS2 activist who blocked one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Hertfordshire Police officers arrest an anti-HS2 activist who blocked one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Hertfordshire Police officers arrest anti-HS2 activists who blocked an entrance to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Hertfordshire Police officers arrest an anti-HS2 activist who used a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Hertfordshire Police officers arrest an anti-HS2 activist after invoking Section 14 of the Public Order Act 1986 to clear an area outside an entrance to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. A protest action by anti-HS2 activists, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Hertfordshire Police officers invoke Section 14 of the Public Order Act 1986 to clear a press photographer from an area outside an entrance to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action by anti-HS2 activists, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • A senior Hertfordshire Police officer invokes Section 14 of the Public Order Act 1986 to clear anti-HS2 activists and press photographers from an area outside an entrance to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action by anti-HS2 activists, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • An anti-HS2 activist uses a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • An anti-HS2 activist with a smoke grenade uses a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • An anti-HS2 activist protests with a sign outside one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use an arm-tube lock-on and a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use arm tube lock-ons and a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use an arm tube lock-on and a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • An anti-HS2 activist uses a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Trucks queue as anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • An anti-HS2 activist uses a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • An anti-HS2 activist uses a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • An anti-HS2 activist uses a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a lock-on arm tube to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use tripods to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Anti-HS2 activists use tripods to block one of several entrances blocked to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • Hertfordshire Police officers arrest an anti-HS2 activist who used a tripod to block one of several entrances to the Chiltern Tunnel South Portal site for the HS2 high-speed rail link for the entire day on 9 October 2020 in West Hyde, United Kingdom. The protest action, at the site from which HS2 Ltd intends to drill a 10-mile tunnel through the Chilterns, was intended to remind Prime Minister Boris Johnson that he committed to remove deforestation from supply chains and to provide legal protection for 30% of UK land for biodiversity by 2030 at the first UN Summit on Biodiversity on 30th September.
    MK-20201009-HS2-Extinction-Is-Foreve...jpg
  • The newly-established 17m South Portal headwall for the 10-mile Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 11th August 2020 in West Hyde, United Kingdom. Construction of the headwall and ground reinforcement using more than 636 soil nails were the final stages requiring completion prior to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines / TBMs.
    MK-20200811-HS2-Chiltern-Tunnel-Sout...jpg
  • Portrait of Mary Olivari, a member of the Serpentine Swimming Club, Hyde Park, London, UK. The Serpentine Lake is situated in Hyde Park, London’s largest central open space. The Serpentine Swimming Club was formed in 1864 ‘to promote the healthful habit of bathing in open water throughout the year’.  Its headquarters were beneath an old elm tree on the south side of the lake, a wooden bench for clothing being the only facility.  At this time London was undergoing rapid expansion and Hyde Park was now in the centre of a densely populated built up area and provided a place of relaxation to its urbanised masses. Now, the club has its own (somewhat spartan) changing facilities and members are  permitted by the Royal Parks to swim in the lake any morning before 09:30.  They race every Saturday morning throughout the year, regardless of the weather.
    SCC_0081_1.jpg
  • Members of the Serpentine Swimming Club walks climb out of the Serpentine Lake after a Saturday race on a cold Winter's day, Hyde Park, London, UK. The Serpentine Lake is situated in Hyde Park, London’s largest central open space. The Serpentine Swimming Club was formed in 1864 ‘to promote the healthful habit of bathing in open water throughout the year’.  Its headquarters were beneath an old elm tree on the south side of the lake, a wooden bench for clothing being the only facility.  At this time London was undergoing rapid expansion and Hyde Park was now in the centre of a densely populated built up area and provided a place of relaxation to its urbanised masses. Now, the club has its own (somewhat spartan) changing facilities and members are  permitted by the Royal Parks to swim in the lake any morning before 09:30.  They race every Saturday morning throughout the year, regardless of the weather.
    A_7226_1.jpg
  • Two women and a man walking in Hyde Park and approach the parks gates, London, United Kingdom.  Hyde Park is one of the largest parks in central London and one of the Royal Parks of London famous for its Speaker’s Corner.
    UK-London-Hyde-Park-7183_1.jpg
  • Cherry blossom on trees in Hyde Park in London, UK. Due to sunny days and cold nights, the season for the flowering trees has been extended longer than is usual.
    20150421_cherry blossom hyde park_J.jpg
  • Cherry blossom on trees in Hyde Park in London, UK. Due to sunny days and cold nights, the season for the flowering trees has been extended longer than is usual.
    20150421_cherry blossom hyde park_N.jpg
  • Cherry blossom on trees in Hyde Park in London, UK. Due to sunny days and cold nights, the season for the flowering trees has been extended longer than is usual.
    20150421_cherry blossom hyde park_G.jpg
  • Cherry blossom on trees in Hyde Park in London, UK. Due to sunny days and cold nights, the season for the flowering trees has been extended longer than is usual.
    20150421_cherry blossom hyde park_O.jpg
Next
  • Facebook
  • Twitter
x

In Pictures

  • About
  • Contact
  • Join In Pictures
  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area