Show Navigation

HS2 Construction Works West Hyde

Preparatory works for the Chiltern Tunnel section of the HS2 high-speed rail link are pictured on 16th February 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.

Add to Cart Add to Lightbox Download
Filename
MK-20220216-HS2-works-Colne-Valley-014.jpg
Copyright
Mark Kerrison
Image Size
3000x2000 / 547.5KB
https://www.markkerrison.com/contact, https://www.markkerrison.com/p/licensing
britain british buckinghamshire bucks chiltern tunnel construction england english environment environmental high speed 2 high speed rail high speed rail link high speed two high-speed 2 high-speed rail high-speed rail link high-speed two hs2 infrastructure line link rail railway road segments site south portal transport tunnel uk united kingdom west hyde
Contained in galleries
Mark Kerrison - All pics
Preparatory works for the Chiltern Tunnel section of the HS2 high-speed rail link are pictured on 16th February 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
Info
  • Facebook
  • Twitter
x

In Pictures

  • About
  • Contact
  • Join In Pictures
  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area